
1. The human part
The first part is the soft conditional we need to establish is the mind of our inspector men, our QC teams were faced the products all for the Europe market, our inspection phase started since the material purchase, the concept in their mind is not the same as the normal third party inspection team, we only focus on the higher requirement since they are a trainees.

2. The hardware inspection equipment part
The second part is the hardware, considered most of our products are the high precision component and finished-product, the caliper can’t meet our inspection requirement. That’s why we not only purchased inspection equipment for passing the AQL or other standard, we also need to design the individual jig for each product to make sure each product from our factory is qualified.
Be your consultant since designing phase
Follow Us